Legal and sustainable timber
BREEAM UK New Construction, Non-domestic Buildings (United Kingdom), Technical Manual, SD5078: BREEAM UK New Construction 2018 3.0, published by BRE Global Limited, suggests that in relation to legal and sustainable timber:
'BREEAM follows the UK government's definition of legal and sustainable timber, as outlined in the Central Point of Timber (CPET) 5th Edition of the UK Government Timber Procurement Policy (TPP). At the time of writing, the policy requires all timber and wood-based products to be covered by at least one of the following (but the webpage below should be checked for changes):
- Third party, independent forest certification schemes–Category A (e.g. FSC or PEFC).
- Evidence on a case-by-case basis in line with the Framework for Evaluating Category B evidence–Category B.
For the avoidance of doubt, 100% of the timber and timber-based products must be compliant. Further information on the UK Government's TPP and compliant responsible sourcing certification schemes is available from the CPET website. Reused timber formwork automatically complies. Reusable timber formwork itself does not automatically comply. All timber used in the manufacturing of the formwork must be covered by a responsible sourcing certification scheme (RSCS) recognised by BREEAM. See Guidance Note 18 for the BREEAM recognised RSCS schemes.'
[edit] Related articles on Designing Buildings
- BRE articles.
- BREEAM.
- Building Research Establishment.
- Forest Stewardship Council.
- Chain of custody.
- Confederation of Timber Industries.
- European Union Timber Regulation.
- Legally harvested and traded timber.
- Programme for the Endorsement of Forest Certification.
- Sustainable timber.
- Sustainable Wood.
- Sustainably procuring tropical hardwood.
- Timber.
- Whole life carbon assessment of timber.
Featured articles and news
Welsh and Scottish 2026 elections
Manifestos for the built environment for upcoming same May day elections.
Advancing BIM education with a competency framework
“We don’t need people who can just draw in 3D. We need people who can think in data.”
Guidance notes to prepare for April ERA changes
From the Electrical Contractors' Association Employee Relations team.
Significant changes to be seen from the new ERA in 2026 and 2027, starting on 6 April 2026.
First aid in the modern workplace with St John Ambulance.
Ireland's National Residential Retrofit Plan
Staged initiatives introduced step by step.
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.




















